
100kg/H - 3000kg/H Wood Biomass Industrial Steam Boiler
Contact Person : Swet Lee
Phone Number : +8618736903078
WhatsApp : +8618736903078
Minimum Order Quantity : | 1 Set/Sets | Price : | Negotiation |
---|---|---|---|
Packaging Details : | The steam boiler is covered with a waterproof film and the transport package is a wooden box. | Delivery Time : | 10-15 work days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 1000 Set/Sets Per Year |
Place of Origin: | Henan China | Brand Name: | SWET |
---|---|---|---|
Certification: | ISO9001 | Model Number: | YDZ |
Detail Information |
|||
Rated Evaporation: | 400kg/h | Weight: | 0.65T |
---|---|---|---|
Preset Pressure: | 0.7mpa | Rated Steam Temperature: | 170℃ |
Application: | Industrial Production | Color: | Customer's Requirement |
Design Fuel: | Biomass | Warranty: | 12months |
Highlight: | oil steam boiler,industrial electric steam boiler |
Product Description
400kg/h Industrial Steam Boiler Automatic Feeding Wood Boiler
1. The inner tank adopts the international advanced three-return vertical water pipe tubular structure, the flue gas and the fin tube fully flush heat exchange, and the thermal efficiency reaches over 92%.
2. The boiler operating system is fully automatic, and all operating states can be seen at a glance in the LCD screen. You can observe the burner working status, boiler water level status, current temperature, feed pump running status, fault alarm status, etc. in the display, so that you can use it more safely.
Fuel Cost analysis(Take 100 kg per hour as an example) | ||||
Equipment selection | Steam volume | Energy consumption | Unit Price | Operating costs |
Electrothermal steam boiler | 100kg | 72 kw/h | 0.08 USD/kw | 10.91 USD |
Fuel steam boiler | 100kg | 7 kg/h | 0.53 USD/kg | 7.42 USD |
Gas steam boiler | 100kg | 8 m³/h natural gas | 0.34 USD/m³ | 5.45 USD |
Biomass steam boiler | 100kg | 20 kg/h wood pellet | 0.08 USD/kg | 3.03 USD |
Q: How can I pay you?
A: T/T is very well used.We also accept other ways, depending on the circumstances
Q: What about the production?
A: Produce time is 30 days
Q: What about the maintenance?
A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts.
Enter Your Message