Henan Swet Boiler Co., Ltd.

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home About Us

Henan Swet Boiler Co., Ltd. Quality Control

Certifications
Good quality Gas Steam Boiler for sales
Good quality Gas Steam Boiler for sales
Customer Reviews
We are very satisfied the machine, it's easy to assemble and operate. advanced controlling theory with high-performance PLC, high level of automatic.

—— Smith

During the three times cooperation, all the machines are working well, hope your company getting better and better. A good beginning is half done.

—— Abdul Moiz

I'm Online Chat Now
QC Profile

1. The team responsible for quality assurance

(1) Under the leadership of the company's quality assurance manager, responsible for the overall quality control of the project, responsible for the preparation, revision and implementation of the quality assurance manual.

(2) Responsible for organizing the construction of technical solutions, especially the key construction technical solutions.

(3) It contacts with the county and county technical supervision departments, consciously listen to the quality supervision and guidance of the installation project.

2Quality assurance team

(1) Lead the team according to the technical requirements of the drawings, construction according to the technical specification.

(2) Doing a good job in the quality evaluation of the team. doing a good job of installation records, statistical statements, to ensure that the data is true and reliable.

3. Quality assurance of equipment and materials

(1) Understanding the technical requirements of the drawings for the required materials.

(2) Seriously preparing the necessary equipment, accessories, materials plan.

(3) According to the storage requirements, do inventory storage work seriously.

4. Structural process control QA

(1) In construction drawings, understand the requirements of the drawings, the construction scheme is worked out, and seriously organize the implementation of the scene.

(2) Doing a good job of all kinds of valve tightness test, safety valve, pressure gauge calibration work.

5. Welding quality assurance

(1) Compile welding process plan and reexamine welding personnel.

(2) Formulate welding renovation technical measures, organize on-site construction.

(3) Taking part in the scrap and repairing work of welding.

(4) Arranging welding records and reporting to archives.

 

 

Certifications
  • Standard:Qualification certificate

  • Standard:Qualification certificate

  • Standard:Business license

  • Standard:Patent

  • Standard:ISO9001

  • Standard:Qualification certificate

  • Standard:Quality certificates

  • Standard:Qualification certificate

Contact Details
Henan Swet Boiler Co., Ltd.

Contact Person: Swet Lee

Tel: 86--18736903078

Fax: 86-371-68064938

Send your inquiry directly to us (0 / 3000)